SN8 sizes at a glance
| Nominal size (DN/ID) | Ring stiffness | Length | Typical use |
|---|---|---|---|
| 200 | SN8 | 6 m | Property and gully connections, small branch lines |
| 300 | SN8 | 6 m | Branch collectors, road gully lines |
| 400 | SN8 | 6 m | Street collectors, development networks |
| 500 | SN8 | 6 m | Larger collectors, culvert crossings |
| 600 | SN8 | 6 m | Main storm collectors, culverts |
What SN8 means
Ring stiffness SN is the pipe's resistance to ring deflection under load, in kN/m², tested to EN ISO 9969. SN4, SN8 and SN12 are the usual classes and GON supplies SN4 to SN12.
SN8 is the common choice under roads and in ground with normal cover. SN4 suits shallow, lightly loaded lines; SN12 suits deep or heavily loaded trenches. The right class comes from the structural design of the trench (cover, soil, traffic), not from the diameter alone.
Standard and construction
Double-wall pipe to EN 13476-3 has a smooth inner bore and a corrugated outer wall. The smooth bore keeps flow capacity high and the pipe easy to clean; the corrugation gives the ring stiffness at low weight. Lengths are 6 m, joined with a socket and sealing ring.
Outside diameter, wall thickness, mass and joint details for each size are in the manufacturer's datasheet, which we send with the quote.
Sizes above DN600
The GON range runs up to Ø3000 mm in SN4 to SN12. For DN800 and larger, send the flow, the slope and the trench depth and we will suggest the class and the supply split.
How to write it in the BOQ
“Double-wall HDPE corrugated pipe DN/ID 400, ring stiffness SN8, EN 13476-3, 6 m lengths with socket and sealing ring; laid on compacted sand bedding with sand side fill to the design.”
Installation basics
- Bed the pipe on compacted sand or fine gravel and fill the sides in layers; never on stones or loose fill.
- Keep the trench only as wide as the design needs: width and side compaction carry the load.
- Check the joint and the seal before backfilling, and keep the minimum cover specified in the design.
Cover depth, bedding and backfill come from the project's structural design, not from this page.
