Reservoir Flow Meter Chambers at Manglisi: Installation Case Study

2026Completed

Reservoir Flow Meter Chambers at Manglisi: Installation Case StudyWater

In early November 2026 the flow-meter chambers at reservoir outlets around Manglisi, at elevations between 1086 and 1248 m, were completed: GON supplied the chamber equipment and a contractor installed it.

Water supply

Project facts

  • Location: Manglisi, postal code 2300
  • Municipality: Tetritskaro Municipality
  • Date of works: 4–6 November 2026
  • Altitude: 1086–1248 m (reservoir site 1246–1248 m; meter chamber 1086–1103 m)
  • Scope: Flow-meter chambers at reservoir outlets, with PE-to-steel transitions
  • Equipment: Ductile iron gate valves, dismantling joint, electromagnetic flow meter with battery-powered converter, PE pipe and electrofusion fittings, epoxy-coated steel pipework (sizes and specification: ask our sales team)
  • Installation contractor: Installed by a contractor; chamber equipment supplied by GON

The requirement

A reservoir outlet is the natural place to measure how much water enters a distribution network. A bulk meter there gives the operator a figure for supply that can be compared against what downstream customers or villages consume. The meter has to sit in a chamber that can be entered safely, drains by itself, and allows the meter or valves to be serviced without taking apart the line. At Manglisi the chambers are at altitude, so they also have to be sealed against groundwater and weather.

What was installed

In flow order, the meter chamber photographed at 1086–1103 m contains:

  1. Isolating gate valve on the inlet side.
  2. Dismantling joint.
  3. Electromagnetic flow meter, with its converter powered by a battery.
  4. Bend, taking the line towards the outlet wall.
  5. Second isolating gate valve on the outlet side.

A drain sump is cast into the chamber floor and a ladder gives access from the hatch. Where the pipe leaves the chamber wall, epoxy-coated steel pipe steps through a concentric reducer to the pipe size beyond.

Installation details visible in the photos

PE-to-steel transition. At the reservoir site (1246 m), PE pipe is joined with electrofusion elbows and a PE flange adapter, which bolts to a blue epoxy-coated steel spool passing through the chamber wall. Plastic pipe runs in the ground; the flanged steel section carries the connection inside the chamber to the valves and meter.

Waterproofing. The chamber beside the buried reservoir (1248 m) has bitumen waterproofing on its outer surface, a lid and a vent pipe.

Dismantling joint. Its purpose is practical: it adjusts the gap between flanges so the flow meter or a valve can be taken out for servicing or replacement without cutting the pipe.

Gate valves on both sides of the meter. Closing both lets a technician isolate the meter section, then remove the meter through the dismantling joint.

Battery-powered converter. An electromagnetic meter with a battery-powered converter suits chambers that have no mains supply. Follow the manufacturer's upstream and downstream straight-run requirements when positioning the meter.

Drain sump and ladder. The sump collects water that enters the chamber; the ladder makes entry and inspection safer.

Result

The chambers at Manglisi were completed by 6 November 2026, built and fitted with their valves, dismantling joints and electromagnetic flow meters, as the photographs show.

Local context

Other public water programmes exist in the same municipality; they are separate from GON's work. A state-budget project of up to ₾49 million was reported to build new 24-hour water systems for about 8,000 people in 15 villages of Tetritskaro municipality, with works ongoing in December 2021 (droa.ge). The source does not name the implementer. The published village list does not name Manglisi, and we found no programme specific to the town.

Products used

Related reading

FAQ

Why put a flow meter at a reservoir outlet? It records the volume leaving the reservoir, giving the operator a reference figure for the whole supply zone downstream.

What is a dismantling joint for? It lets you remove a meter or valve from a flanged line without cutting the pipe, and it absorbs small differences in fitting length.

Can an electromagnetic meter work without mains power? Yes, when fitted with a battery-powered converter, as in the Manglisi chambers. Battery life and display options depend on the model; ask our sales team for the specification.

Why use a PE flange adapter? It turns the end of a PE pipe into a flanged connection, so PE can be bolted to steel, valves or meters inside the chamber.

Need the exact sizes and specification? Ask our sales team

Pipe sizes (DN), meter specification and quantities depend on each project. Contact GON's sales team at gon.ge/contact or call +995 595 818 800. Send your bill of quantities (BOQ) and we will respond with a supply proposal.

More projects

Also supplied to spec.