WATER SUPPLY · KAKHETI REGION: SIGHNAGHI

Kakheti Water Supply Metering: Village Chamber Rollout

2026Completed

Kakheti Water Supply Metering: Village Chamber RolloutWater

GON's project map marks the village water metering points across Kakheti, from Sighnaghi in the south-east to Dedoplistskaro in the east. The work was completed in 2026: GON supplied the chamber equipment and a contractor installed it.

Water supply

Project facts

  • **Location:** Kakheti region: Sighnaghi, Bodbe, Tibaani, Abroshiki/Ozaani, Tavtskaro, Dedoplistskaro, Khornabuji, Samreklo
  • **Date of works:** Completed in 2026
  • **Scope:** Village water supply metering chambers
  • **Equipment:** Gate valves, dismantling joints, battery electromagnetic flow meters (sizes and specification: ask our sales team)
  • **Installation contractor:** Installed by a contractor; chamber equipment supplied by GON

The requirement

Village water systems in a wide region like Kakheti are hard to manage without data. A flow meter on each supply point shows how much water enters a village network, so the operator can compare it with what is consumed, find losses and plan repairs. Where there is no mains power at the site, a battery-powered electromagnetic meter removes the need for a cable run.

What was installed

The map layer groups the points by area: Sighnaghi, Bodbe and Tibaani; Abroshiki and Ozaani; Tavtskaro; Dedoplistskaro; and Khornabuji and Samreklo.

The chamber configuration is the one GON supplied and photographed at Tetritskaro and Manglisi in October and November 2026:

  1. Gate valve on the inlet side
  2. Dismantling joint
  3. Battery electromagnetic flow meter
  4. Gate valve on the outlet side

The assembly sits in a concrete chamber with a hatch, a ladder and a drain sump. Chambers of this type are used on reservoir outlets and village supply lines.

Installation details

  • Isolation both sides. Two gate valves let the chamber be shut off and the meter serviced or replaced without draining the line.
  • Dismantling joint. It allows the meter or a valve to be removed without moving the pipework.
  • Battery converter. The meter runs without a power cable, which suits remote village sites.
  • Drain sump and ladder. The sump keeps water away from the equipment and the ladder gives safe access through the hatch.
  • Flanged, coated pipework. In the reference chambers the steel spools are epoxy-coated, and PE pipe connects through flange adapters.

Result

The aim of the rollout is the same at every point: a measured, serviceable supply point for each village system. We publish no savings or loss-reduction figures because none have been confirmed.

Local context

Other public programmes in Kakheti are separate from GON's work. In Sighnaghi municipality, UWSCG reported ₾7 million of works in Nukriani, Zemo Magharo and Zemo Bodbe, part of a ₾40 million programme for 16 villages and about 30,000 residents (Agenda.ge). In Dedoplistskaro, a design-and-build contract covering the town, Khornabuji and Samreklo was awarded for ₾32.61 million (TenderMonitor), and a separate six-village contract including Tavtskaro had a ₾13.51 million estimate (TenderMonitor). In 2026 UWSCG sought a design consultant for an EIB-financed network fed from headworks in Shroma, Lagodekhi, to serve Sighnaghi and Dedoplistskaro municipalities, including a new reservoir for Ozaani (EIB).

Products used

Related reading

FAQ

Which villages does this cover? The map marks Sighnaghi, Bodbe, Tibaani, Abroshiki/Ozaani, Tavtskaro, Dedoplistskaro, Khornabuji and Samreklo.

Why a battery-powered meter? Many village supply points have no mains power. A battery electromagnetic meter works there, and the battery life should be checked against the supplier's datasheet, which our sales team can provide.

Can the readings be collected remotely? Remote reading is an option on many electromagnetic meters; ask our sales team which option suits your project. See remote-read water meters.

Can GON supply a full chamber set for a village project? Yes: valves, dismantling joints, flow meters, fittings and pipes for the standard chamber, to your BOQ.

Need the exact sizes and specification? Ask our sales team

Pipe sizes (DN), meter specification and quantities depend on each project. Contact GON's sales team at gon.ge/contact or call +995 595 818 800. Send your bill of quantities (BOQ) and we will respond with a supply proposal.

More projects

Also supplied to spec.

All projects
Project supply

Have a project? Send us your BOQ.

Upload the bill of quantities or specification. We return a line-by-line quote with stock, lead times and certificates.

GON delivery truck on site