Village Water Metering in Tetritskaro Municipality: Anatomy of a Flow-Meter Chamber

2026Completed

Village Water Metering in Tetritskaro Municipality: Anatomy of a Flow-Meter ChamberWater

Village flow-meter chambers in Tetritskaro municipality, at around 1333 m, were completed in October 2026 and photographed on 24 and 25 October: GON supplied the chamber equipment and a contractor installed it.

Water supply

Project facts

  • Location: Villages in Tetritskaro municipality
  • Municipality: Tetritskaro
  • Date of works: 24–25 October 2026
  • Altitude: About 1333 m
  • Scope: Village flow-meter chambers
  • Equipment: Gate valves, dismantling joint, electromagnetic flow meter (sizes and specification: ask our sales team)
  • Installation contractor: Installed by a contractor; chamber equipment supplied by GON

The requirement

A village water network needs a measured figure for what enters it. Without a meter at the point of supply, an operator cannot tell how much water a village receives or compare supply with what households use. The meter therefore goes into a dedicated chamber on the supply line. The chamber has to let staff reach, isolate and replace the meter safely, without digging up the pipe.

Anatomy of the chamber, in flow order

Water enters the concrete chamber and passes through four components in sequence:

  1. Isolating gate valve (inlet). Closing it stops flow into the chamber so work can be done downstream.
  2. Dismantling joint. A flanged telescopic piece that changes the length of the line slightly. Once the valves are shut, it is loosened and the meter can come out without cutting any pipe.
  3. Electromagnetic flow meter. It measures flow with no moving parts in the stream, so the bore stays open.
  4. Isolating gate valve (outlet). Together with the inlet valve it fully isolates the meter section.

The photographs also show a ladder fixed to the chamber wall, and a drain sump in the floor visible from the hatch. Both are reached through the hatch, so the assembly is serviced from above.

Installation details visible in the photos

Everything is inline and flanged. In both chambers the valves, dismantling joint and meter sit on one straight flanged run. Flanged connections allow every component to be unbolted and replaced individually.

Isolation on both sides. A valve only upstream would leave the meter exposed to pressure from downstream. Two valves let a technician make the section safe from either direction.

Sump for water control. Water that enters a buried chamber has to go somewhere. The sump in the floor gives it a collection point away from the equipment.

Access. A fixed ladder and a hatch above the assembly mean a technician can reach the meter display and the flanges. Confined-space entry procedures still apply.

Meter positioning. Follow the manufacturer's upstream and downstream straight-run requirements for the chosen meter. For a view of the same assembly where the pipe passes through the wall as PE-to-steel with a reducer, see our Manglisi reservoir chambers case study.

Result

The photographs from 24 and 25 October 2026 show completed chambers with the full valve, dismantling joint and electromagnetic meter assembly in place.

Local context

Other public water programmes exist in the same municipality; they are separate from GON's work. A state-budget project of up to ₾49 million was reported to build new 24-hour water systems for about 8,000 people in 15 villages of Tetritskaro municipality, with works ongoing in December 2021 (droa.ge). The source does not name the implementer. We do not link that programme to the chambers described here.

Products used

Related reading

FAQ

What is in a typical village flow-meter chamber? In these chambers: an inlet gate valve, a dismantling joint, an electromagnetic flow meter and an outlet gate valve, with a ladder and a drain sump.

Why two gate valves instead of one? Two valves isolate the meter section on both sides, so the meter can be removed or serviced safely.

Do I need to cut the pipe to replace the meter? Not with a dismantling joint. After closing the valves, you loosen the joint and lift the meter out of the flanged line.

Can GON supply the whole chamber assembly? GON supplied the chamber equipment shown here, installed by a contractor. Send your BOQ with DN sizes and we will confirm what can be supplied.

Need the exact sizes and specification? Ask our sales team

Pipe sizes (DN), meter specification and quantities depend on each project. Contact GON's sales team at gon.ge/contact or call +995 595 818 800. Send your bill of quantities (BOQ) and we will respond with a supply proposal.

More projects

Also supplied to spec.