At The Valley Bakuriani, a resort development in Didveli, the water inlet now runs through a metering chamber with a gate valve, a dismantling joint and a new electromagnetic flow meter on flanged, epoxy-coated pipework.
Project facts
- **Location:** The Valley Bakuriani, Didveli, Bakuriani (41.72465, 43.5329)
- **Municipality:** Borjomi Municipality
- **Date of works:** Completed by 11 November 2026 (date of the site photo)
- **Scope:** Water inlet metering chamber: isolation, dismantling and flow measurement on the site supply line
- **Equipment:** Gate valve, dismantling joint, electromagnetic flow meter, flanged blue epoxy-coated pipework (sizes and specification: ask our sales team)
- **Installation contractor:** Installed by a contractor; chamber equipment supplied by GON
The requirement: why a developer meters the inlet
A resort development normally takes its water from the public network through one inlet. Whatever the utility's exact rules, there are practical reasons to measure at that point:
- Billing and handover. A meter at the site boundary gives the developer and the utility the same reference reading to work from.
- Leak detection. Compare the inlet reading with the sum of consumption inside the site. Flow that continues when the resort is quiet points to losses in the internal network.
- Seasonal peaks. Mountain resorts swing between busy and empty periods. A flow meter records that profile, which helps in operating and, later, in extending the network.
- Frost. Bakuriani winters are cold, so equipment sits in a buried concrete chamber rather than on the surface.
What was installed
The photograph from 11 November 2026 shows the chamber interior: a gate valve, a dismantling joint and a new electromagnetic flow meter, joined by flanged pipework with a blue epoxy coating, all inside a concrete chamber. This is the same family of assembly GON supplies for reservoir and village chambers elsewhere in Georgia, for example in the Tetritskaro and Manglisi projects.
Installation details
- Meter still wrapped. The protective wrap is on the new meter, which indicates a fresh installation. Leaving it in place until commissioning is normal practice, to protect the instrument from construction dust and damp.
- Flanged connections. Flanges let each component be unbolted and replaced without cutting pipe.
- Dismantling joint. It gives the axial adjustment needed to remove the meter or the valve for service without disturbing the rest of the pipework.
- Gate valve. It isolates the chamber so the meter can be serviced or verified.
- Epoxy-coated steel. The coating protects the pipework in a damp underground chamber.
- Straight-run and orientation. Meter manufacturers specify straight-pipe requirements upstream and downstream of the electromagnetic meter, as set out in the datasheet of the chosen meter.
Result
The chamber was completed by 11 November 2026, the date of the site photo, with the metering assembly in place. The development now has a fixed measuring point on its water inlet. No performance figures are published here because none have been confirmed.
Local context
Bakuriani is a growing mountain resort with its own public water programmes, none of them GON contracts. In May 2026 UWSCG published an initial selection for design and build of a Bakuriani wastewater treatment plant, with applications due 15 July 2026 and the sewer network outside that scope (water.gov.ge). Earlier, UWSCG tendered Bakuriani water supply works of about ₾10 million each, covering well drilling and system optimisation (cbw.ge), and two artificial lakes were reported under construction to feed snow-making ahead of the 2023 championship (bm.ge). We found no published water or sewer facts for The Valley itself.
Products used
- Electromagnetic flow meters and water meters
- Gate valves
- Fittings, including dismantling joints and flanged connections
- Pipes
Related reading
- Bulk flow meters: electromagnetic, ultrasonic or Woltmann
- Water meter boxes: specification
- Remote-read water meters
FAQ
Why meter the inlet and not only individual units? The inlet meter measures everything entering the site, including common areas and network losses that unit meters never see. Together the two readings show where water goes.
Do I need a dismantling joint next to the meter? It is strongly advisable. Flanged meters and valves are tight between fixed flanges, and the joint makes removal and refitting possible.
Can the meter be read remotely? Electromagnetic meters can be supplied with remote-reading options; ask our sales team which option suits your project. See our guide to remote-read water meters.
What do you need to quote a metering chamber? Pipe size (DN), expected flow range, working pressure, power availability, communication needs and chamber dimensions. A BOQ with these items is enough to start.
Need the exact sizes and specification? Ask our sales team
Pipe sizes (DN), meter specification and quantities depend on each project. Contact GON's sales team at gon.ge/contact or call +995 595 818 800. Send your bill of quantities (BOQ) and we will respond with a supply proposal.